Our Series Continues: Considering Cluster Lifecycle Management

By Deepak Khosla

October 22, 2014

In the first cluster management column, I discussed the importance of performing a needs assessment to ensure that an organization implementing its first HPC cluster designs a system that fulfills the requirements of its users and ultimately provides a positive ROI for the enterprise. It’s important to keep in mind there are no one-size-fits-all solutions in HPC implementation. Your cluster design – which includes critical elements such as selections of nodes, interconnects and operating system – will be unique based on your particular needs.

As explained in the first column, much of the needs assessment must focus on the software applications that will be run on the cluster because their operational parameters dictate selection of many critical system components, compute nodes being first on the list. Each application has an optimal memory bandwidth, expressed in terms of gigabits per second (Gbps), which it needs to run effectively for each CPU in the node. The key is choosing / designing a node that can most effectively support the Gbps rating of the application across the number of CPUs within the node

For the typical organization, even one implementing a small HPC cluster, there are often multiple applications that will be run on the system. In this situation, the Gbps rating of the most memory bandwidth-intensive application should be taken into account when deciding on compute nodes. So if the most demanding application requires 64 Gbps of memory bandwidth, a node with that throughput will accommodate not just the one application but also all those requiring less memory bandwidth. The size of memory in the node is the other important factor. The required memory per CPU or overall for each application will dictate how much memory needs to be designed per node.

There are, however, implementations in which one application is a memory hog compared to all of the others combined. In that case, it is often less expensive to install one or more large memory nodes (often called ‘fat nodes’) for that particular application, and ‘thin nodes’ to handle the other less demanding applications.

The number of nodes installed in the cluster will depend on many variables, but one of the most important is a business consideration. Multiple nodes accelerate the speed with which the cluster performs its processing and produces the answers desired by the organization. Driven by business requirements, some organizations may need their applications to generate answers in two hours, while eight hours is sufficient for others. Multiple nodes provide results faster and will be worth the extra investment by some organizations.

Another important element in cluster design is the need for local disk space on the node. This is dependent on data input/output (I/O) requirements of the applications that will run on the system. Each application is rated for a certain frequency and volume of data reads and writes. Some applications will require the local disk to provide temporary ‘scratch’ space to hold data generated during processing. If scratch is needed, the I/O bandwidth of the application will dictate how many drives to put in the local node.

Reading and writing data to and from local disks takes time. For some applications, the speed with which they can read/write data can be more important than the volume of data involved. These applications are considered ‘latency sensitive’ (needing low latency) with respect to disk I/O.

Bandwidth and latency both play roles in selection of disk drives for the node and can significantly impact the overall cost of the implementation. Generally speaking, applications with high I/O and low latency ratings require SSD drives, which are the most expensive. High I/O and medium latency applications can get by with SAS drives, middle of the road in price. If latency is not an issue for the application, SATA drives are sufficient and also the least costly.

In addition to local disks, the cluster will need to have access to data on some central storage to facilitate getting input data and storing output data which needs to be shared among all nodes, as well as with external users. These external storage devices will move data to and from the nodes through an I/O-interconnect. Typically, 1G or 10G connection per node may be sufficient for accessing shared storage. The reason is that since this is shared storage access, the throughput of the network or the storage itself is usually the limiting factor. For high throughput, low latency I/O needs, it is best to use local storage.

Another key implementation factor dictated by the applications is the need for an application-interconnect that allows nodes to communicate with each other. Some applications require low-latency communication among the nodes in the cluster, and some do not. For those that require latency in the single digit microseconds or throughput over 10Gbps, for example, InfiniBand (IB) is the best fit today.

At the other extreme, if the application only requires high volume data transfers at the beginning and end of the jobs, and has very light inter-node communication needs, then a single 1G or 10G interconnect could handle both I/O and application traffic. If Ethernet is determined to be sufficient, then even if the need is 1G today, it is still recommended to specify systems with the 10G built-in port to handle future growth as it is becoming the default configuration.

The final decision in the cluster design is the operating environment. Again, the applications drive this selection. Certain applications run most efficiently in specific operating environments, and this requirement is well documented for each application. For an organization running multiple applications on its cluster, the challenge is finding one operating environment that satisfies the specifications of all applications. This is usually the least expensive option.

Often, however, multiple applications will require more than one operating environment. One option at this point is to install separate sets of nodes, each running the desired operating system. But there is another option – set up the nodes to run in multiple operating environments by establishing a provisioning system to dynamically switch from one environment to the other when particular applications are running. While complicated, this provides flexibility to match the resources to the workload.

In the next column, I will address the steps to take in using your cluster design to find the vendor that can supply you with the right system.

Subscribe to HPCwire's Weekly Update!

Be the most informed person in the room! Stay ahead of the tech trends with industry updates delivered to you every week!

Empowering High-Performance Computing for Artificial Intelligence

April 19, 2024

Artificial intelligence (AI) presents some of the most challenging demands in information technology, especially concerning computing power and data movement. As a result of these challenges, high-performance computing Read more…

Kathy Yelick on Post-Exascale Challenges

April 18, 2024

With the exascale era underway, the HPC community is already turning its attention to zettascale computing, the next of the 1,000-fold performance leaps that have occurred about once a decade. With this in mind, the ISC Read more…

2024 Winter Classic: Texas Two Step

April 18, 2024

Texas Tech University. Their middle name is ‘tech’, so it’s no surprise that they’ve been fielding not one, but two teams in the last three Winter Classic cluster competitions. Their teams, dubbed Matador and Red Read more…

2024 Winter Classic: The Return of Team Fayetteville

April 18, 2024

Hailing from Fayetteville, NC, Fayetteville State University stayed under the radar in their first Winter Classic competition in 2022. Solid students for sure, but not a lot of HPC experience. All good. They didn’t Read more…

Software Specialist Horizon Quantum to Build First-of-a-Kind Hardware Testbed

April 18, 2024

Horizon Quantum Computing, a Singapore-based quantum software start-up, announced today it would build its own testbed of quantum computers, starting with use of Rigetti’s Novera 9-qubit QPU. The approach by a quantum Read more…

2024 Winter Classic: Meet Team Morehouse

April 17, 2024

Morehouse College? The university is well-known for their long list of illustrious graduates, the rigor of their academics, and the quality of the instruction. They were one of the first schools to sign up for the Winter Read more…

Kathy Yelick on Post-Exascale Challenges

April 18, 2024

With the exascale era underway, the HPC community is already turning its attention to zettascale computing, the next of the 1,000-fold performance leaps that ha Read more…

Software Specialist Horizon Quantum to Build First-of-a-Kind Hardware Testbed

April 18, 2024

Horizon Quantum Computing, a Singapore-based quantum software start-up, announced today it would build its own testbed of quantum computers, starting with use o Read more…

MLCommons Launches New AI Safety Benchmark Initiative

April 16, 2024

MLCommons, organizer of the popular MLPerf benchmarking exercises (training and inference), is starting a new effort to benchmark AI Safety, one of the most pre Read more…

Exciting Updates From Stanford HAI’s Seventh Annual AI Index Report

April 15, 2024

As the AI revolution marches on, it is vital to continually reassess how this technology is reshaping our world. To that end, researchers at Stanford’s Instit Read more…

Intel’s Vision Advantage: Chips Are Available Off-the-Shelf

April 11, 2024

The chip market is facing a crisis: chip development is now concentrated in the hands of the few. A confluence of events this week reminded us how few chips Read more…

The VC View: Quantonation’s Deep Dive into Funding Quantum Start-ups

April 11, 2024

Yesterday Quantonation — which promotes itself as a one-of-a-kind venture capital (VC) company specializing in quantum science and deep physics  — announce Read more…

Nvidia’s GTC Is the New Intel IDF

April 9, 2024

After many years, Nvidia's GPU Technology Conference (GTC) was back in person and has become the conference for those who care about semiconductors and AI. I Read more…

Google Announces Homegrown ARM-based CPUs 

April 9, 2024

Google sprang a surprise at the ongoing Google Next Cloud conference by introducing its own ARM-based CPU called Axion, which will be offered to customers in it Read more…

Nvidia H100: Are 550,000 GPUs Enough for This Year?

August 17, 2023

The GPU Squeeze continues to place a premium on Nvidia H100 GPUs. In a recent Financial Times article, Nvidia reports that it expects to ship 550,000 of its lat Read more…

Synopsys Eats Ansys: Does HPC Get Indigestion?

February 8, 2024

Recently, it was announced that Synopsys is buying HPC tool developer Ansys. Started in Pittsburgh, Pa., in 1970 as Swanson Analysis Systems, Inc. (SASI) by John Swanson (and eventually renamed), Ansys serves the CAE (Computer Aided Engineering)/multiphysics engineering simulation market. Read more…

Intel’s Server and PC Chip Development Will Blur After 2025

January 15, 2024

Intel's dealing with much more than chip rivals breathing down its neck; it is simultaneously integrating a bevy of new technologies such as chiplets, artificia Read more…

Choosing the Right GPU for LLM Inference and Training

December 11, 2023

Accelerating the training and inference processes of deep learning models is crucial for unleashing their true potential and NVIDIA GPUs have emerged as a game- Read more…

Baidu Exits Quantum, Closely Following Alibaba’s Earlier Move

January 5, 2024

Reuters reported this week that Baidu, China’s giant e-commerce and services provider, is exiting the quantum computing development arena. Reuters reported � Read more…

Comparing NVIDIA A100 and NVIDIA L40S: Which GPU is Ideal for AI and Graphics-Intensive Workloads?

October 30, 2023

With long lead times for the NVIDIA H100 and A100 GPUs, many organizations are looking at the new NVIDIA L40S GPU, which it’s a new GPU optimized for AI and g Read more…

Shutterstock 1179408610

Google Addresses the Mysteries of Its Hypercomputer 

December 28, 2023

When Google launched its Hypercomputer earlier this month (December 2023), the first reaction was, "Say what?" It turns out that the Hypercomputer is Google's t Read more…

AMD MI3000A

How AMD May Get Across the CUDA Moat

October 5, 2023

When discussing GenAI, the term "GPU" almost always enters the conversation and the topic often moves toward performance and access. Interestingly, the word "GPU" is assumed to mean "Nvidia" products. (As an aside, the popular Nvidia hardware used in GenAI are not technically... Read more…

Leading Solution Providers

Contributors

Shutterstock 1606064203

Meta’s Zuckerberg Puts Its AI Future in the Hands of 600,000 GPUs

January 25, 2024

In under two minutes, Meta's CEO, Mark Zuckerberg, laid out the company's AI plans, which included a plan to build an artificial intelligence system with the eq Read more…

China Is All In on a RISC-V Future

January 8, 2024

The state of RISC-V in China was discussed in a recent report released by the Jamestown Foundation, a Washington, D.C.-based think tank. The report, entitled "E Read more…

Shutterstock 1285747942

AMD’s Horsepower-packed MI300X GPU Beats Nvidia’s Upcoming H200

December 7, 2023

AMD and Nvidia are locked in an AI performance battle – much like the gaming GPU performance clash the companies have waged for decades. AMD has claimed it Read more…

DoD Takes a Long View of Quantum Computing

December 19, 2023

Given the large sums tied to expensive weapon systems – think $100-million-plus per F-35 fighter – it’s easy to forget the U.S. Department of Defense is a Read more…

Nvidia’s New Blackwell GPU Can Train AI Models with Trillions of Parameters

March 18, 2024

Nvidia's latest and fastest GPU, codenamed Blackwell, is here and will underpin the company's AI plans this year. The chip offers performance improvements from Read more…

Eyes on the Quantum Prize – D-Wave Says its Time is Now

January 30, 2024

Early quantum computing pioneer D-Wave again asserted – that at least for D-Wave – the commercial quantum era has begun. Speaking at its first in-person Ana Read more…

GenAI Having Major Impact on Data Culture, Survey Says

February 21, 2024

While 2023 was the year of GenAI, the adoption rates for GenAI did not match expectations. Most organizations are continuing to invest in GenAI but are yet to Read more…

The GenAI Datacenter Squeeze Is Here

February 1, 2024

The immediate effect of the GenAI GPU Squeeze was to reduce availability, either direct purchase or cloud access, increase cost, and push demand through the roof. A secondary issue has been developing over the last several years. Even though your organization secured several racks... Read more…

  • arrow
  • Click Here for More Headlines
  • arrow
HPCwire