NSF Extends Access to Its Leadership Systems Blue Waters & Frontera

By Staff

December 14, 2018

The National Science Foundation is seeking supplemental requests for access on its leadership-class computers Blue Waters and Frontera to enable “fundamental science and engineering research that would otherwise not be possible.” Principal investigators (PIs) with active NSF awards are invited to submit funding requests no later than February 1, 2019. Resources will be available for the allocations starting April 1, 2019, and running through December 2019.

Jim Kurose, the National Science Foundation’s assistant director of computer and information science and engineering, made the announcement in a Dear Colleague letter, dated Dec. 12. For Blue Waters, the Cray machine deployed at the National Center for Supercomputing Applications, NSF aims to offer 125 million node hours distributed among five to six proposals. Allocations of up to 34 million node hours split among 15-20 requests will be available on Frontera, the NSF’s new tier-1 system built by Dell-EMC and installed at the Texas Advanced Computing Center.

Further details are outlined in this excerpt:

BLUE WATERS

Blue Waters is one of the most powerful academic supercomputers in the world. It is deployed at the National Center for Supercomputing Applications (NCSA) at the University of Illinois at Urbana-Champaign (UIUC). Blue Waters is a Cray XE system with over 22,000 AMD processors and 4,000 NVIDIA Graphics Processor Units (GPUs). The system also has significant memory and storage capabilities. More information about the system can be found at https://bluewaters.ncsa.illinois.edu/blue-waters-overview. The Blue Waters system will continue full operations through December 2019.

Principal Investigators (PIs) with active NSF awards and a compelling need for significant computation requirements to solve grand challenge problems in S&E are invited to submit supplemental funding requests for allocations on Blue Waters. NSF anticipates 125 million node hours will be available for allocation as supplements to active NSF awards for the period April through December 2019, and further anticipates these node hours will be distributed among five to six such supplemental funding requests with clearly justified goals for solving significant grand challenge research problems in any S&E domain.

NSF’s Proposal and Award Policies and Procedures Guide (PAPPG) provides specific guidance on preparing supplemental funding requests (see Chapter VI.E.4). NSF anticipates supplemental funding requests pursuant to this DCL may include as part of their budgets up to $15,000 to support travel for technical coordination with the Blue Waters team.

A supplemental funding request for a Blue Waters allocation must specify and clearly justify the requested allocation in terms of node hours (see https://bluewaters.ncsa.illinois.edu/node_core_comparison for more information about Blue Waters node performance), and must address the following:

• A compelling articulation of the S&E grand challenge research problem that is being addressed that justifies the need for a large compute allocation on the Blue Waters system;

• A demonstration of a high degree of readiness to utilize the remaining computer cycles on the Blue Waters system; and

• A demonstration of sufficient existing funding to directly support the S&E research that is being proposed.

FRONTERA

Frontera is anticipated to be the most powerful academic supercomputer ever deployed by NSF. The system will be housed at the Texas Advanced Computing Center (TACC) at The University of Texas at Austin and is expected to begin early operations in early 2019. Frontera will be a DellEMC system and will provision over 16,000 Intel XEON processors, as well as significant GPU, storage, and memory capabilities. More information about the system can be found at https://www.tacc.utexas.edu/systems/frontera.

PIs with active NSF awards are invited to submit supplemental funding requests for an early-science allocation on Frontera system. Early-science teams will closely collaborate with the Frontera project team to prepare and port scientific codes at the largest scale, and lessons learned from Frontera early-science users will be incorporated into future operational support for the system. A key goal of this early-science allocation is to support S&E research that would not otherwise be possible without access to this unique new leadership-class computing capability. NSF anticipates 34 million node hours will be available for allocation as supplements to active NSF awards for the period between April and December 2019, and further anticipates these node hours will be distributed among 15 to 20 such supplemental funding requests. The anticipated start date for early user access to Frontera is April 2019.

NSF’s PAPPG provides specific guidance on preparing a request for supplemental funding (see Chapter VI.E.4). NSF anticipates supplemental funding requests pursuant to this DCL may include as part of their budgets up to $15,000 to support travel for technical coordination with the Frontera project team to enable collaborative code porting activities.

A supplemental funding request for a Frontera early-science allocation must specify and clearly justify the requested allocation in terms of node hours, and must address the following:

• A compelling articulation of the S&E research problem that is being addressed via the request;

• A convincing case for the need to access a leadership-class computing system, and the inability to conduct the S&E research elsewhere; and

• A demonstration of sufficient existing funding to directly support the S&E research that is being proposed.

Read the full letter here: https://www.nsf.gov/pubs/2019/nsf19030/nsf19030.jsp

Subscribe to HPCwire's Weekly Update!

Be the most informed person in the room! Stay ahead of the tech trends with industry updates delivered to you every week!

MLPerf Inference 4.0 Results Showcase GenAI; Nvidia Still Dominates

March 28, 2024

There were no startling surprises in the latest MLPerf Inference benchmark (4.0) results released yesterday. Two new workloads — Llama 2 and Stable Diffusion XL — were added to the benchmark suite as MLPerf continues Read more…

Q&A with Nvidia’s Chief of DGX Systems on the DGX-GB200 Rack-scale System

March 27, 2024

Pictures of Nvidia's new flagship mega-server, the DGX GB200, on the GTC show floor got favorable reactions on social media for the sheer amount of computing power it brings to artificial intelligence.  Nvidia's DGX Read more…

Call for Participation in Workshop on Potential NSF CISE Quantum Initiative

March 26, 2024

Editor’s Note: Next month there will be a workshop to discuss what a quantum initiative led by NSF’s Computer, Information Science and Engineering (CISE) directorate could entail. The details are posted below in a Ca Read more…

Waseda U. Researchers Reports New Quantum Algorithm for Speeding Optimization

March 25, 2024

Optimization problems cover a wide range of applications and are often cited as good candidates for quantum computing. However, the execution time for constrained combinatorial optimization applications on quantum device Read more…

NVLink: Faster Interconnects and Switches to Help Relieve Data Bottlenecks

March 25, 2024

Nvidia’s new Blackwell architecture may have stolen the show this week at the GPU Technology Conference in San Jose, California. But an emerging bottleneck at the network layer threatens to make bigger and brawnier pro Read more…

Who is David Blackwell?

March 22, 2024

During GTC24, co-founder and president of NVIDIA Jensen Huang unveiled the Blackwell GPU. This GPU itself is heavily optimized for AI work, boasting 192GB of HBM3E memory as well as the the ability to train 1 trillion pa Read more…

MLPerf Inference 4.0 Results Showcase GenAI; Nvidia Still Dominates

March 28, 2024

There were no startling surprises in the latest MLPerf Inference benchmark (4.0) results released yesterday. Two new workloads — Llama 2 and Stable Diffusion Read more…

Q&A with Nvidia’s Chief of DGX Systems on the DGX-GB200 Rack-scale System

March 27, 2024

Pictures of Nvidia's new flagship mega-server, the DGX GB200, on the GTC show floor got favorable reactions on social media for the sheer amount of computing po Read more…

NVLink: Faster Interconnects and Switches to Help Relieve Data Bottlenecks

March 25, 2024

Nvidia’s new Blackwell architecture may have stolen the show this week at the GPU Technology Conference in San Jose, California. But an emerging bottleneck at Read more…

Who is David Blackwell?

March 22, 2024

During GTC24, co-founder and president of NVIDIA Jensen Huang unveiled the Blackwell GPU. This GPU itself is heavily optimized for AI work, boasting 192GB of HB Read more…

Nvidia Looks to Accelerate GenAI Adoption with NIM

March 19, 2024

Today at the GPU Technology Conference, Nvidia launched a new offering aimed at helping customers quickly deploy their generative AI applications in a secure, s Read more…

The Generative AI Future Is Now, Nvidia’s Huang Says

March 19, 2024

We are in the early days of a transformative shift in how business gets done thanks to the advent of generative AI, according to Nvidia CEO and cofounder Jensen Read more…

Nvidia’s New Blackwell GPU Can Train AI Models with Trillions of Parameters

March 18, 2024

Nvidia's latest and fastest GPU, codenamed Blackwell, is here and will underpin the company's AI plans this year. The chip offers performance improvements from Read more…

Nvidia Showcases Quantum Cloud, Expanding Quantum Portfolio at GTC24

March 18, 2024

Nvidia’s barrage of quantum news at GTC24 this week includes new products, signature collaborations, and a new Nvidia Quantum Cloud for quantum developers. Wh Read more…

Alibaba Shuts Down its Quantum Computing Effort

November 30, 2023

In case you missed it, China’s e-commerce giant Alibaba has shut down its quantum computing research effort. It’s not entirely clear what drove the change. Read more…

Nvidia H100: Are 550,000 GPUs Enough for This Year?

August 17, 2023

The GPU Squeeze continues to place a premium on Nvidia H100 GPUs. In a recent Financial Times article, Nvidia reports that it expects to ship 550,000 of its lat Read more…

Shutterstock 1285747942

AMD’s Horsepower-packed MI300X GPU Beats Nvidia’s Upcoming H200

December 7, 2023

AMD and Nvidia are locked in an AI performance battle – much like the gaming GPU performance clash the companies have waged for decades. AMD has claimed it Read more…

DoD Takes a Long View of Quantum Computing

December 19, 2023

Given the large sums tied to expensive weapon systems – think $100-million-plus per F-35 fighter – it’s easy to forget the U.S. Department of Defense is a Read more…

Synopsys Eats Ansys: Does HPC Get Indigestion?

February 8, 2024

Recently, it was announced that Synopsys is buying HPC tool developer Ansys. Started in Pittsburgh, Pa., in 1970 as Swanson Analysis Systems, Inc. (SASI) by John Swanson (and eventually renamed), Ansys serves the CAE (Computer Aided Engineering)/multiphysics engineering simulation market. Read more…

Choosing the Right GPU for LLM Inference and Training

December 11, 2023

Accelerating the training and inference processes of deep learning models is crucial for unleashing their true potential and NVIDIA GPUs have emerged as a game- Read more…

Intel’s Server and PC Chip Development Will Blur After 2025

January 15, 2024

Intel's dealing with much more than chip rivals breathing down its neck; it is simultaneously integrating a bevy of new technologies such as chiplets, artificia Read more…

Baidu Exits Quantum, Closely Following Alibaba’s Earlier Move

January 5, 2024

Reuters reported this week that Baidu, China’s giant e-commerce and services provider, is exiting the quantum computing development arena. Reuters reported � Read more…

Leading Solution Providers

Contributors

Comparing NVIDIA A100 and NVIDIA L40S: Which GPU is Ideal for AI and Graphics-Intensive Workloads?

October 30, 2023

With long lead times for the NVIDIA H100 and A100 GPUs, many organizations are looking at the new NVIDIA L40S GPU, which it’s a new GPU optimized for AI and g Read more…

Shutterstock 1179408610

Google Addresses the Mysteries of Its Hypercomputer 

December 28, 2023

When Google launched its Hypercomputer earlier this month (December 2023), the first reaction was, "Say what?" It turns out that the Hypercomputer is Google's t Read more…

AMD MI3000A

How AMD May Get Across the CUDA Moat

October 5, 2023

When discussing GenAI, the term "GPU" almost always enters the conversation and the topic often moves toward performance and access. Interestingly, the word "GPU" is assumed to mean "Nvidia" products. (As an aside, the popular Nvidia hardware used in GenAI are not technically... Read more…

Shutterstock 1606064203

Meta’s Zuckerberg Puts Its AI Future in the Hands of 600,000 GPUs

January 25, 2024

In under two minutes, Meta's CEO, Mark Zuckerberg, laid out the company's AI plans, which included a plan to build an artificial intelligence system with the eq Read more…

Google Introduces ‘Hypercomputer’ to Its AI Infrastructure

December 11, 2023

Google ran out of monikers to describe its new AI system released on December 7. Supercomputer perhaps wasn't an apt description, so it settled on Hypercomputer Read more…

China Is All In on a RISC-V Future

January 8, 2024

The state of RISC-V in China was discussed in a recent report released by the Jamestown Foundation, a Washington, D.C.-based think tank. The report, entitled "E Read more…

Intel Won’t Have a Xeon Max Chip with New Emerald Rapids CPU

December 14, 2023

As expected, Intel officially announced its 5th generation Xeon server chips codenamed Emerald Rapids at an event in New York City, where the focus was really o Read more…

IBM Quantum Summit: Two New QPUs, Upgraded Qiskit, 10-year Roadmap and More

December 4, 2023

IBM kicks off its annual Quantum Summit today and will announce a broad range of advances including its much-anticipated 1121-qubit Condor QPU, a smaller 133-qu Read more…

  • arrow
  • Click Here for More Headlines
  • arrow
HPCwire