Roll Your Own Lustre — Are You On Your Own?

By Alan Swahn

December 4, 2014

Lustre is a popular open source parallel file system with many years of development behind it. People trying to roll their own HPC scratch storage with Lustre may find a number of inherent problems. If there isn’t in-house Lustre expertise to deploy and keep it optimally running, the work may need to be outsourced. But the total cost of ownership most likely goes up, which is counter to why companies and universities roll their own in the first place. Lustre is just one part of the HPC storage software stack that needs to be compatible and tuned for performance; the stack also includes a patched Linux kernel, firmware, and drivers.

Paper architectures and expected performance for Lustre-based storage are theoretical, until the software and hardware are working together and rigorously tested. Otherwise the time spent diagnosing incompatibilities or performance mismatched components could be significant. There are many potential points of contention or bottlenecks in an HPC solution. It’s not just the choices for the hardware—servers, controllers, network fabric, and disks—but also how well the software/firmware executes on the hardware. Be wary of the “kit” approach that requires assembly and considerable knowhow.

image 1

Figure 1: RYO Lustre File System with Potential Hotspots Highlighted

With the Lustre kit approach, two metadata servers (MDS) would likely be purchased, where one is active and the other is for failover. One or more pairs of active object storage servers (OSS) would be in the bill of materials, depending on the performance required. A small storage array is necessary for the metadata (MDT) and a pair of large storage arrays with controllers (RBODs for object storage) matching up with each pair of OSSes (see Figure 1). Note the cross coupling for High Availability (HA). Now it gets a bit more challenging. How many drives are needed to saturate the controllers to get the highest throughput? It’s likely in the range of 60-120 drives. If a storage array with a fast controller is purchased (e.g. NetApp E series with a Soyuz controller) it may be necessary to put a JBOD array behind each RBOD array to saturate the controllers or be left with a slow Lustre file system. If the controllers are saturated and more capacity is required, just stack JBODs behind the RBODs.

The network fabric used to connect up the aforementioned servers and storage can have a profound effect on performance. If 40 Gbps Ethernet (40 GbE) is used, up to 40% of the system throughput could be lost compared to 56 Gbps Ethernet or Infiniband. Bonding the 40 GbE ports may sound like a good idea, but there may be no real gains in throughput. Are the connections between the OSSes and object storage 6 Gbps or 12 Gbps SAS? Depending on the architecture and components selected, 12 Gbps SAS may be overkill. With some guidance from the hardware vendors, the right hardware choices can be made. The software side is a bit trickier.

Downloading open source Luster or purchasing Intel’s version (IEEL) only provides part of the software stack required. A patched Linux kernel (readily available) and a strategy to monitor the hardware are required. The various hardware components have their own API and/or supplied command line utilities, but there aren’t any sensors provided with the Lustre distribution to call them and collect metrics. The sensors would report through a scalable monitoring framework to a management application, but they are missing in the case of open source Lustre and sorely lacking in third party versions. It’s a real headache to diagnose, fix, and tune Lustre-based storage without comprehensive hardware monitoring and management software to analyze the metrics collected, correlate events, and create reports. Support also suffers without hardware monitoring to raise alerts on failures or pending failures.

Tuning Lustre, the hardware, and clients can be perplexing. There is literature on tuning Lustre, but be careful as turning one knob may have a positive effect on one area of the system and a negative effect on another. For the drivers and firmware, the hardware vendor can help, but don’t be surprised if it takes multiple calls and remote access to the system. Outside the Lustre-based storage, the clients also have their own parameters, which can affect performance. Be prepared to become knowledgeable, outsource the required expertise, or buy a service contract to get the end-to-end solution tuned up.

An alternative is the HPC storage appliance model. Like the name indicates, the appliance rolls-in, plugs-in, and runs like enterprise storage with little assembly required. It is rack based and will need to be connected to the network and clients given access. The number of racks depends on the performance and capacity required. The highest performing appliance with 4 TB drives that I have seen has a total capacity of 2 PB (raw) running at 20 GB/s in a single 42U rack and scaling linearly in performance and capacity for each additional rack. 6 TB and 8 TB drives are on the near horizon, so appliance performance density should double over the next year.

Appliances are highly available, meaning if there is a component failure, the system keeps on running and raises an alert. There is no loss of data or downtime. With an appliance, the software stack is certified and optimized on the target hardware before it gets to the customer site. The hardware components are carefully selected to get the most performance density. The software stack includes system management software to monitor data, performance, and reliability. A complete working system is delivered, not a kit to be assembled. This allows the system to be up and running acceptance tests in hours. Purpose built sensors and near real-time monitoring (e.g. every 5s) are included. The software will raise an alert if there is likely to be a component problem (pre-emptive alert) or failure and indicate what needs to be fixed. If the system isn’t running at peak performance for a particular workload, there are built-in performance analytics to help spot the bottlenecks, such as overloaded servers, poor data striping, client access patterns, or unbalanced application codes.

The monitoring software metrics include performance, network, server, storage (controller, drives, and utilization), temperature, online/offline, physical connections, and power. The amount of performance metrics collected per year are substantial, but require less than 1% of the raw storage. The sensors and monitoring software are on their own private network as to not interfere with the application codes that are running and this separation provides a layer of reliability. The private network can be 1 GbE, until somewhere in the range of 50-75 petabytes, then 10 GbE is needed to handle the amount of traffic on the management network. (see Table 1).

Screen Shot 2014-12-04 at 11.29.23 AM

Table 1: Performance Metric Collected and Private Network Requirements

HPC vendors and customers usually focus on the combination of cost, performance, and capacity. Lifecycle considerations should be just as important to a purchasing decision. Selection on broader considerations lowers total cost of ownership, keep scratch storage running fast for different types of workloads, and make the system highly available 24x7x365. The cost of downtime can be considerable.

Considerations should include:

  • System manufactured before delivery
  • Installation in hours
  • Hardware components matched—no built-in bottlenecks
  • Certified software stack on target hardware
  • System-level high availability—redundancy and failover
  • Purpose built sensors
  • Near real-time hardware monitoring
  • Tools to tune workload performance
  • Diagnostics w/ correlation engine
  • Performance analytics
  • Turnkey appliance—no Lustre expertise required
  • One-stop system-wide customer support
  • Phone-home support
  • Scalable management architecture
  • Fast Lustre escalation path

If the purchasing decision is optimized along these vectors, then the chances of long term success go up and TCO goes down. Below (Figure 2) is an example of a fully vetted storage appliance in an HPC environment. Compare this to the system in Figure 1.

In summary, the appliance model has a number of advantages to consider before rolling your own Lustre-based storage.

last image

Figure 2: Storage Appliance Model

 

 

About Alan Swahn, Vice President of Marketing, Terascala

Prior to joining Terascala, Alan was vice president of marketing and business development at ManageSoft that was acquired by Flexera Software in FY2010. He also co-founded LightSpeed Semiconductor, where he was instrumental in defining a new market category for single mask programmable ASICs. Alan was part of two startups that had successful IPOs—Viewlogic Systems and Daisy Systems. Swahn holds a Bachelor of Science in Electrical Engineering with High Honors from Rochester Institute of Technology and an AEET with Highest Distinction from Penn State University. Alan also holds two patents (8,838,736, 8,015,259). Read more about Alan on LinkedIn.

Subscribe to HPCwire's Weekly Update!

Be the most informed person in the room! Stay ahead of the tech trends with industry updates delivered to you every week!

Atos Outlines Plans to Get Acquired, and a Path Forward

May 21, 2024

Atos – via its subsidiary Eviden – is the second major supercomputer maker outside of HPE, while others have largely dropped out. The lack of integrators and Atos' financial turmoil have the HPC market worried. If Read more…

Core42 Is Building Its 172 Million-core AI Supercomputer in Texas

May 20, 2024

UAE-based Core42 is building an AI supercomputer with 172 million cores which will become operational later this year. The system, Condor Galaxy 3, was announced earlier this year and will have 192 nodes with Cerebras Read more…

Google Announces Sixth-generation AI Chip, a TPU Called Trillium

May 17, 2024

On Tuesday May 14th, Google announced its sixth-generation TPU (tensor processing unit) called Trillium.  The chip, essentially a TPU v6, is the company's latest weapon in the AI battle with GPU maker Nvidia and clou Read more…

ISC 2024 Student Cluster Competition

May 16, 2024

The 2024 ISC 2024 competition welcomed 19 virtual (remote) and eight in-person teams. The in-person teams participated in the conference venue and, while the virtual teams competed using the Bridges-2 supercomputers at t Read more…

Grace Hopper Gets Busy with Science 

May 16, 2024

Nvidia’s new Grace Hopper Superchip (GH200) processor has landed in nine new worldwide systems. The GH200 is a recently announced chip from Nvidia that eliminates the PCI bus from the CPU/GPU communications pathway.  Read more…

Europe’s Race towards Quantum-HPC Integration and Quantum Advantage

May 16, 2024

What an interesting panel, Quantum Advantage — Where are We and What is Needed? While the panelists looked slightly weary — their’s was, after all, one of the last panels at ISC 2024 — the discussion was fascinat Read more…

Atos Outlines Plans to Get Acquired, and a Path Forward

May 21, 2024

Atos – via its subsidiary Eviden – is the second major supercomputer maker outside of HPE, while others have largely dropped out. The lack of integrators Read more…

Google Announces Sixth-generation AI Chip, a TPU Called Trillium

May 17, 2024

On Tuesday May 14th, Google announced its sixth-generation TPU (tensor processing unit) called Trillium.  The chip, essentially a TPU v6, is the company's l Read more…

Europe’s Race towards Quantum-HPC Integration and Quantum Advantage

May 16, 2024

What an interesting panel, Quantum Advantage — Where are We and What is Needed? While the panelists looked slightly weary — their’s was, after all, one of Read more…

The Future of AI in Science

May 15, 2024

AI is one of the most transformative and valuable scientific tools ever developed. By harnessing vast amounts of data and computational power, AI systems can un Read more…

Some Reasons Why Aurora Didn’t Take First Place in the Top500 List

May 15, 2024

The makers of the Aurora supercomputer, which is housed at the Argonne National Laboratory, gave some reasons why the system didn't make the top spot on the Top Read more…

ISC 2024 Keynote: High-precision Computing Will Be a Foundation for AI Models

May 15, 2024

Some scientific computing applications cannot sacrifice accuracy and will always require high-precision computing. Therefore, conventional high-performance c Read more…

Shutterstock 493860193

Linux Foundation Announces the Launch of the High-Performance Software Foundation

May 14, 2024

The Linux Foundation, the nonprofit organization enabling mass innovation through open source, is excited to announce the launch of the High-Performance Softw Read more…

ISC 2024: Hyperion Research Predicts HPC Market Rebound after Flat 2023

May 13, 2024

First, the top line: the overall HPC market was flat in 2023 at roughly $37 billion, bogged down by supply chain issues and slowed acceptance of some larger sys Read more…

Synopsys Eats Ansys: Does HPC Get Indigestion?

February 8, 2024

Recently, it was announced that Synopsys is buying HPC tool developer Ansys. Started in Pittsburgh, Pa., in 1970 as Swanson Analysis Systems, Inc. (SASI) by John Swanson (and eventually renamed), Ansys serves the CAE (Computer Aided Engineering)/multiphysics engineering simulation market. Read more…

Nvidia H100: Are 550,000 GPUs Enough for This Year?

August 17, 2023

The GPU Squeeze continues to place a premium on Nvidia H100 GPUs. In a recent Financial Times article, Nvidia reports that it expects to ship 550,000 of its lat Read more…

Comparing NVIDIA A100 and NVIDIA L40S: Which GPU is Ideal for AI and Graphics-Intensive Workloads?

October 30, 2023

With long lead times for the NVIDIA H100 and A100 GPUs, many organizations are looking at the new NVIDIA L40S GPU, which it’s a new GPU optimized for AI and g Read more…

Choosing the Right GPU for LLM Inference and Training

December 11, 2023

Accelerating the training and inference processes of deep learning models is crucial for unleashing their true potential and NVIDIA GPUs have emerged as a game- Read more…

Shutterstock 1606064203

Meta’s Zuckerberg Puts Its AI Future in the Hands of 600,000 GPUs

January 25, 2024

In under two minutes, Meta's CEO, Mark Zuckerberg, laid out the company's AI plans, which included a plan to build an artificial intelligence system with the eq Read more…

AMD MI3000A

How AMD May Get Across the CUDA Moat

October 5, 2023

When discussing GenAI, the term "GPU" almost always enters the conversation and the topic often moves toward performance and access. Interestingly, the word "GPU" is assumed to mean "Nvidia" products. (As an aside, the popular Nvidia hardware used in GenAI are not technically... Read more…

Nvidia’s New Blackwell GPU Can Train AI Models with Trillions of Parameters

March 18, 2024

Nvidia's latest and fastest GPU, codenamed Blackwell, is here and will underpin the company's AI plans this year. The chip offers performance improvements from Read more…

Some Reasons Why Aurora Didn’t Take First Place in the Top500 List

May 15, 2024

The makers of the Aurora supercomputer, which is housed at the Argonne National Laboratory, gave some reasons why the system didn't make the top spot on the Top Read more…

Leading Solution Providers

Contributors

Eyes on the Quantum Prize – D-Wave Says its Time is Now

January 30, 2024

Early quantum computing pioneer D-Wave again asserted – that at least for D-Wave – the commercial quantum era has begun. Speaking at its first in-person Ana Read more…

Shutterstock 1285747942

AMD’s Horsepower-packed MI300X GPU Beats Nvidia’s Upcoming H200

December 7, 2023

AMD and Nvidia are locked in an AI performance battle – much like the gaming GPU performance clash the companies have waged for decades. AMD has claimed it Read more…

The GenAI Datacenter Squeeze Is Here

February 1, 2024

The immediate effect of the GenAI GPU Squeeze was to reduce availability, either direct purchase or cloud access, increase cost, and push demand through the roof. A secondary issue has been developing over the last several years. Even though your organization secured several racks... Read more…

Intel Plans Falcon Shores 2 GPU Supercomputing Chip for 2026  

August 8, 2023

Intel is planning to onboard a new version of the Falcon Shores chip in 2026, which is code-named Falcon Shores 2. The new product was announced by CEO Pat Gel Read more…

The NASA Black Hole Plunge

May 7, 2024

We have all thought about it. No one has done it, but now, thanks to HPC, we see what it looks like. Hold on to your feet because NASA has released videos of wh Read more…

GenAI Having Major Impact on Data Culture, Survey Says

February 21, 2024

While 2023 was the year of GenAI, the adoption rates for GenAI did not match expectations. Most organizations are continuing to invest in GenAI but are yet to Read more…

How the Chip Industry is Helping a Battery Company

May 8, 2024

Chip companies, once seen as engineering pure plays, are now at the center of geopolitical intrigue. Chip manufacturing firms, especially TSMC and Intel, have b Read more…

Q&A with Nvidia’s Chief of DGX Systems on the DGX-GB200 Rack-scale System

March 27, 2024

Pictures of Nvidia's new flagship mega-server, the DGX GB200, on the GTC show floor got favorable reactions on social media for the sheer amount of computing po Read more…

  • arrow
  • Click Here for More Headlines
  • arrow
HPCwire